Skip to content
Home/Our Approach/How we work
Our Approach

Start with one evidence problem.

No platform-wide rollout, no data migration programme, no twelve months of configuration before anything is usable. One facility, the records you already keep, and — at the end of it — a set of figures that can be defended in front of whoever asks.

The shape of an engagement

Twelve weeks, four phases, one facility.

Timings are typical rather than contractual; a site with clean meter data moves faster, and a site whose records live in four systems takes longer. Nothing in the first three phases requires a change to how your operations already run.

PhaseWhat happensWhat we need from youWhat you hold at the end
Weeks 0–2
Scope
One facility and three to five parameters are chosen; the period is agreed, usually 12 to 24 months of history; the frameworks the figures must serve are confirmed; a preparer and a separate reviewer are named. A named owner and about an hour of their week; read access to records you already keep; one walkthrough of how those records are produced today. A written scope: which figures, which period, which boundary, and the evidence expected behind each figure.
Weeks 3–6
Connect
Records come in as they exist — meter exports, fuel logs, utility invoices, water and waste manifests, supplier declarations. Each figure is bound to its record with period, unit, entity and capture time, and classed as measured, reported, reference or estimated. The records themselves, in whatever format they already have. No re-keying, no new data collection, no standardisation exercise first. Figures that are recorded rather than typed: an evidence row behind each one, and an honest list of what is still an estimate.
Weeks 7–12
Prove
Each figure is reviewed by someone other than its preparer and cross-checked against an independent reference within a tolerance you set. Disagreements are held and recorded, never averaged away. Confidence appears per figure, and a report edition is issued with its certificate. A reviewer who is not the preparer; decisions on tolerances per quantity; an hour to walk through the first flagged figures. Evidence-linked dashboards, a Data-Trust profile per figure, an issued report edition with its certificate and timestamp, and a gap list naming exactly what is weak.
After
Extend
The same shape moves to the next facility, the next parameter, the value chain, or the framework pack you report against — on evidence that keeps accumulating instead of being rebuilt each year. A decision on where the next evidence problem is, and who owns it. A repeatable cycle rather than an annual reconstruction, and a trail that lengthens rather than resets.
Division of labour

Who does what.

EcoVeraZ

  • Configure the tenant, the roles and the capability boundaries
  • Bind records to figures and set up the cross-checks and tolerances
  • Train your preparers, reviewers and issuers on the workflow
  • Produce the report editions and the certificates
  • Answer the evidence questions your auditor, assurer or lender asks about how figures were prepared

Your team

  • Name a preparer and a reviewer, and keep them different people
  • Give access to the records the site already produces
  • Decide boundaries, tolerances and what counts as an acceptable estimate
  • Review figures — the platform will not publish anything a person has not confirmed
  • Own what is published, as you already do
What we ask for

Less than most people expect.

A pilot runs on records that already exist because someone in finance, engineering or EHS already needs them. If a record does not exist today, it stays absent and is marked as a gap — we do not fill it in.

  • Electricity and HT meter exportsUsually available

    Monthly or interval readings, with landlord and tenant meters separated where the site already splits them.

  • Fuel and utility invoicesUsually available

    Diesel, LPG, gas and purchased-utility invoices, from finance or straight out of the ERP.

  • Water and waste manifestsUsually available

    Meter readings, tanker records and the authorised handler’s manifests, as they are filed today.

  • Operational logsOften available

    DG run hours, weighbridge tickets, BMS exports, production volumes or occupancy — whichever the site keeps.

  • Supplier declarationsOften available

    For value-chain figures, whatever documents your larger suppliers already send with a delivery or an invoice.

  • Sub-meteringSometimes absent

    Where it does not exist, the allocation is labelled an estimate and reported as one rather than presented as measured.

Boundaries

What an engagement does not include.

An assurance opinion or certification of any kind; legal or regulatory advice; replacing a carbon accounting or reporting tool that already works for you; or publishing anything on your behalf. Evidence sits beneath those, and they stay yours.

Commercials, plainly

Pilots are scoped per facility and priced per engagement, so we discuss commercials directly rather than publishing a price list that would fit nobody. A pilot starts without a long-term commitment; hosting, processing and subprocessor terms are set out in the Data Processing Addendum, and the control-by-control security position is in the Trust Center, both readable before you talk to anyone here.

Common questions

Do we have to move our data into EcoVeraZ?

No. Records are read as they exist and bound to figures with their period, unit, entity and capture time; the source system stays where it is and stays the source of truth for its own operations.

What if our data is messy?

That is the normal starting condition and it is what the first weeks surface. Missing evidence lowers a figure’s score and appears on the gap list; it is never quietly filled in, because a gap you can see is worth more than a number you cannot defend.

Who needs to be involved from our side?

One owner with about an hour a week, a preparer who knows where the records live, and a reviewer who is not the preparer. Larger sites sometimes add an engineering contact for meter questions.

How quickly do we see something usable?

Figures typically start appearing with their evidence in the connect phase, in the first four to six weeks, and an issued edition with its certificate comes at the end of the prove phase. Timings depend on how many systems the records live in.

What happens after the pilot?

Either it extends — another facility, another parameter, the value chain, or the framework pack you report against — or it stops, and you keep the evidence and the outputs produced during it. Nothing about the pilot is designed to make leaving expensive.

EcoVeraZ prepares evidence for disclosure and review. It is not an ESG rating agency, does not certify compliance and does not issue assurance opinions.

See the evidence behind your numbers.

A 30-minute walkthrough on your own data, with your own questions.

Request a demo